France: the live status of the French electricity grid

France runs Europe's most nuclear-heavy grid - over half its generation typically comes from RTE's 56 reactors - and is the continent's biggest electricity exporter, thanks to that spare nuclear capacity. It sits inside the Continental Europe synchronous area coordinated by ENTSO-E, and connects to Great Britain directly through three subsea interconnectors: IFA, IFA2 and ElecLink. Demand, generation, day-ahead price and generation mix below are live from the ENTSO-E Transparency Platform.

Live, updated Loading live data...

of France's power is renewable right now

Loading live data...

Loading live data…

Data as of Loading live data…

Day-ahead price
€–/MWh
Demand
–GW
Generation
–GW

Loading live data…

Generation mix right now

Loading live data…

France generation by source
SourceGW%
Loading live data…

    Nuclear's roughly 55-60% baseload share is the defining feature of France's grid - one of the lowest-carbon large grids in the world as a result.

    Generation by source right now, ranked highest to lowest.

    Replay today

    Move the slider to see the generation mix at any point so far today.

    Loading live data...

    Today so far

    Loading live data...

    Records

    Loading...

    Generation mix over the last 24 hours

      Renewable (wind, solar, hydro, biomass), nuclear, fossil and other, from the ENTSO-E Transparency Platform.

      History

      Choose a time range to see real recorded demand, generation and day-ahead price over time, from the ENTSO-E Transparency Platform.

      Cross-border flows

      Physical flows across each border today, from the ENTSO-E Transparency Platform. Borders are fetched one at a time, so each one updates every few hours.

      Loading...

      Long-term history

      Electricity generated each year, by source, from each country's official yearly statistics.

      Loading...

      Records

      Loading...

      Browse every day in the archive

      About the French grid

      RTE (Réseau de Transport d'Électricité) operates France's transmission grid, part of the Continental Europe synchronous area alongside Germany, Spain, Italy and most of the rest of mainland Europe - all locked to the same 50Hz frequency and trading through coupled day-ahead markets. France's 56 nuclear reactors, mostly built in a concentrated programme through the 1980s, give it the highest share of nuclear generation of any major grid worldwide, and routinely make it Europe's largest net electricity exporter.

      That nuclear baseload is complemented by significant hydro capacity (concentrated in the Alps and Pyrenees, providing fast-responding flexibility that nuclear itself cannot), a growing wind and solar fleet, and a small, shrinking fossil-fuel fleet used mainly to cover winter demand peaks and occasional nuclear outages. France connects to Great Britain via three subsea interconnectors - IFA (opened 1986, one of the first international power links anywhere), IFA2 (2021) and ElecLink (2022, routed through the Channel Tunnel) - together capable of moving several gigawatts in either direction depending on relative prices and demand.

      Records & context

      • All-time demand record102.1GW - 8 February 2012, 7pm
      • Highest wind output20.1GW - 23 October 2025, 1.30pm
      • Highest solar output23.8GW - 21 March 2026, 1pm
      • Nuclear share of generation~68% in 2025 (373TWh) - typically 65-70%
      • Operating nuclear reactors57
      • Net exportsRecord 92.3TWh in 2025 - a net exporter every year since 1980 except 2022

      Approximate nuclear share of French generation by year - dipped in 2022 due to reactor maintenance and corrosion inspections, recovering since.

      Sources: RTE eco2mix key figures (records), RTE annual review 2025, EDF nuclear fleet, Euractiv (2022 net imports). Last checked: 2 October 2026.

      Data sources for France

      The Elexon Insights Solution, NESO Data Portal and Carbon Intensity API that power the Great Britain pages are GB-specific and do not cover France, so this page draws on a different source instead:

      • ENTSO-E Transparency Platform - the pan-European grid data hub, required by EU regulation for every connected TSO (RTE included) to publish to. Powers demand, generation, day-ahead price, the generation mix, the 24-hour mix chart and the History section above, all via France's own bidding zone. Requires the site operator's own free API token, obtained through a short registration process - shows "not enough recorded history yet" rather than a placeholder figure if one is not set or ingestion has not run yet.

      Two figures are not shown on this page at all: ENTSO-E does not publish emissions intensity (g/kWh), and its generation-per-type data does not include cross-border physical flow (reading that out per-interconnector - IFA/IFA2/ElecLink individually - would need a separate query this page does not make), so rather than show a permanently illustrative placeholder for either, they are left out until a real source exists. See the sitewide data sources page for how this compares to the other pages.